A protected bike network that links all nine public schools, the Square, three MARTA stations and Oakhurst Village, with a new north–south connector on the west side. It builds on the city's adopted Safe Streets Safety Action Plan and the projects already under way. Lanes come out only where traffic volumes allow it. The busiest roads get paths beside the street instead.
Click any colored line on the map or a row in the corridor table to see today's layout, the proposal, traffic volume, and the expected effect on car traffic. Drag to pan; use the buttons or scroll to zoom.
Most of this network is already in a city or GDOT plan. The sources are the 2016 PATH Connectivity Plan, the 2025 Safety Action Plan, 2026 city projects, GDOT's College Ave project, and the Scott Blvd RAISE grant. Each piece below falls into one of three groups. Show this on the map.
| Corridor or greenway | What the city or GDOT proposes today | What this proposal changes |
|---|
Decatur recorded 3,451 crashes from 2019 to 2023. People walking and biking were in only 3% of them but made up 40% of fatal and serious-injury crashes. The figures below come from the city's own crash layer, the same data behind the Safety Action Plan, filtered to the 38 bicycle and 55 pedestrian crashes.
What this means for design. Most bike crashes happen where there is no bike facility and a driver is turning. A painted line does not stop a turning driver. Protected intersections and hardened turn lines do, so every corridor below includes its intersections, not only the blocks between them. The two 2023 right-hook crashes on the Church Street cycle track show that protection fails where it is interrupted by driveways. Those gaps need fixing too.
85% of Decatur's serious crashes happen at intersections, so this is where the proposal is most specific. The list below was picked from the data: walking and biking crashes were grouped by location, and the worst clusters on or beside the proposed network were kept, along with two high-volume junctions where bikeways meet. Each card shows what the police reports say went wrong, what we propose, and which problem each fix answers.
| What went wrong | Walking and biking crashes at these sites | What we propose | Where |
|---|
Counts include every crash within 250 ft of the centre of each intersection, 2019–2023. A crash near two listed intersections is counted once, at the nearer one. "What the crash reports show" summarises the police narratives for the walking and biking crashes. Percentages are federal averages for each treatment, not predictions for these sites.
Yes, parking cars on the outside is a recognized best practice. FHWA's Separated Bike Lane Planning and Design Guide and NACTO's Urban Bikeway Design Guide both list on-street parking as a form of vertical separation. Swapping the parking lane and the bike lane, so parked cars sit between moving traffic and people on bikes, gives protection at almost no cost and keeps the parking. It works only with three details: a 3-ft buffer so opening car doors do not hit riders, daylighting (no parking 20–30 ft before crosswalks and driveways) so drivers and riders can see each other, and flex posts in the buffer so the lane stays protected when the spaces are empty.
| Street condition | Facility | Decatur streets | Effect on car traffic |
|---|---|---|---|
| Under ~3,000 vehicles/day, 25 mph or less | Neighborhood greenway: signs, speed humps, crossing islands, diverters where needed | Oakview Rd, Avery St, Mead Rd, Erie Ave, Electric Ave | None. Through traffic is gently discouraged. |
| 3,000–6,000/day, 25–30 mph | Protected or buffered lane, using space from narrower lanes or parking | S McDonough St, E Lake Dr, E Howard Ave | None; no lanes removed |
| Over 6,000/day or over 25 mph, up to ~20,000–25,000/day | Protected bike lane. A 4-to-3 road diet where four lanes exist. | Clairemont Ave, Commerce Dr, Church St, W Ponce, W College Ave | Low to moderate. FHWA finds 4-to-3 conversions keep similar capacity on these volumes and cut crashes 19–47%. |
| Over ~25,000/day or 40 mph | Shared-use path behind the curb, or a corridor study before any lane change | Scott Blvd (path), E College Ave and E Ponce (study) | None for paths. Studies decide the rest. |
Volumes marked "GDOT 2023" come from the Safety Action Plan. Others are estimates from the AADT field in the city's crash layer and need confirming with GDOT TADA counts. Click a row to show it on the map.
| Corridor | Facility | Today | Vehicles/day | Traffic impact | Phase | Miles |
|---|
| Greenway | Connects | New greenway streets | Phase | Miles |
|---|
Greenway routes were chosen by a least-stress routing over the OpenStreetMap street network. Arterials cost far more per foot than residential streets, and protected corridors cost the least. Miles count only new greenway streets; segments on existing trails or proposed corridors are not double-counted. Each route should be walked and checked with neighbors and school PTAs before it is signed.
Scott Blvd carries about 40,000 vehicles a day and keeps all four lanes. Riders get a separate path behind the curb. E College Ave and E Ponce de Leon Ave, at 23,000–28,000 a day, go to GDOT and city corridor studies before any lane changes.
The 4-to-3 conversions are on Clairemont (19,300), Commerce (12,500–13,000) and downtown Church St. All are within the range where FHWA finds a center turn lane offsets the lost through lane, because left-turning cars no longer block the inside lane.
Parking-protected layouts on W Ponce and Church St keep the parking or add to it; the Church St option adds 9–11 spaces. Removing parking is a last resort, used only at daylighted corners.
Phase 1 uses paint, posts and planters, as Decatur did on W Howard in 2018 and plans for Church St. Travel times, speeds and bike counts get measured for 6–12 months before concrete is poured, so any problem can be fixed for little cost.
Funding paths. Adopting the Safety Action Plan made Decatur eligible for SS4A Implementation grants, which fit the HIN corridors (Clairemont, Commerce, E College). Scott Blvd already has a $1.87M RAISE planning grant. State routes (Clairemont, Commerce, College, Scott) can go through GDOT Quick Response and safety programs. Greenways and quick-builds fit ARC Transportation Alternatives and the city's capital and SPLOST budget. The S McDonough–Oakview spine is already in the adopted PATH plan.
Method and limits. Corridors were snapped to OpenStreetMap streets and measured along the street. A crash counts as "on the network" if it lies within 40 m (130 ft) of a proposed route. School access is measured as the straight-line distance from each school to the nearest protected bikeway, trail or greenway. OSM may not show every existing facility, such as the newest W Howard cycle track. Traffic volumes other than Clairemont and Commerce are planning estimates. This is a citizen proposal for discussion, not an engineering design. Every corridor needs survey, traffic analysis, and GDOT review where it is a state route.